DENKO THILAWA OIL STORAGE TANK TERMINAL PROJECT

OWNER (CLIENT)

Denko Petrochemical Management Co. Ltd.

LOCATION

Yangon - Myanmar

SCOPE OF SERVICES

EPC

PROJECT COMPLETION DATE

Jun/2018- Nov/2019

PROJECT DESCRIPTION

Main Process System: Terminal Area (10 tanks, with capacity of 135,000 m3). Unloading system from Jetty to Terminal and Barge loading from terminal to ship, Truck loading area (16 loading bays), Additive injection and Dye coloring System Utilities, facilities system include : Compressed Air, water supply, oilly water collection and treatment, Instrumentation system included the SCADA + PLC, ESD system, Fire and Gas system, Tank Gauging system, Metering skid and Batch control, field instrument, Electrical System included: Medium Voltage System (33kV), Transformer, LV Switchgear, MCC, Distribution Panel, UPS, Diesel Generator, Cable, cable tray, …LV System: Lighting system, Grounding and Lightning system, Telecommunication, LAN, CCTV, Paging System, Fire fighting system and Fire Alarm Other infrastructure of terminal such as tank foundation, underground water pond, pipe rack and pipe bridge, road & paving, drainage system, fence and gate.

Project images

Related projects

Oil & Gas

Thi Vai LNG Receiving Terminal Expansion Project

AUG/2025 - DEC/2025

Asset 4bb11
Oil & Gas

THE BIOLOGICAL POND SYSTEM PROJECT

Jul/2021 - Nov/2022

Asset 4bb11
Oil & Gas

LONG SON – NEW AIR SEPARATION PLANT PROJECT

Nov/2019 - Apr/2021

Asset 4bb11
Oil & Gas

SON MY LNG TERMINAL PROJECT

Nov/2022 – May/2023

Asset 4bb11
Oil & Gas

YEN HUNG LPG STORAGE TERMINAL PROJECT

Aug/2023 - Sep/2026

Asset 4bb11

Send US A MESSAGE

Contact us now for the fastest consultation & answers to questions