DI-AMMONIUM PHOSPHATE FERTILIZER PLANT

OWNER (CLIENT)

DAP 2 - Vinachem Joint Stock Company

LOCATION

Lao Cai Province

SCOPE OF SERVICES

EPC Turn -Key Lump Sum (consortium with TTCL Public)

PROJECT COMPLETION DATE

Jan/2012 – Oct/2014

PROJECT DESCRIPTION

Main process system: Sulfuric Acid plant (Include: Sulfuric Acid storage and Sulfur storage); Photphoric Acid unit (Include: photphoric acid storage, Gypsum treatment disposal area); DAP Plant ( Main production, DAP Storage and packing..); Power Generator Station (Coal Storage, Boiler and Slag dump, Turbine). Utilities, facilities system include: Boiler system, instrument air system, water supply system, Demin Water system, Electrical System included the electrical Substation with MV Switchgear, transformer, MCC, Distribution panel and Power cable, UPS, Control and Instrumentation system included DCS system, PLC system, Instrument Protection system (IPS), Fire and Gas System (FGS), Operational Data store (ODS),.. Fire alarm system, fire fighting system, Grounding & Lightning protection system and other ELV system, Communicate system, … Other infrastructure of plant such as Process building, pipe rack, pipe bridge, raw material warehouse, product warehouse, Admin building, Laboratory building, Liquid Ammonia storage, road & paving, drainage system, fence and gate…

Project images

Related projects

Fertilizer, Chemical & Petrochemical

BULK DELIVERY SYSTEM PROJECT

Dec/2019 - Oct/2020

Asset 4bb11
Fertilizer, Chemical & Petrochemical

GREEN FIELD PROJECT

Apr/2018 – Apr/2021

Asset 4bb11
Fertilizer, Chemical & Petrochemical

CHLOR ALKALI PLANT PROJECT

May/2018 – Sep/2019

Asset 4bb11
Fertilizer, Chemical & Petrochemical

SeAH M&S VIETNAM PLANT PROJECT

May/2023 - Apr/2024

Asset 4bb11
Fertilizer, Chemical & Petrochemical

SeAH M&S VIETNAM PLANT PROJECT (EPC)

Oct/2024 - Aug/2025

Asset 4bb11
Fertilizer, Chemical & Petrochemical

AMMONIUM NITRATE PLANT PROJECT

Apr/2014 - Nov/2015

Asset 4bb11
Fertilizer, Chemical & Petrochemical

UFC85/FORMALDEHYDE PLANT PROJECT

Apr/2014 - Nov/2015

Asset 4bb11