Oil & Gas


OWNER (CLIENT)
LNG Son My Terminal Limited Liability Company
LOCATION
Son My 1 Industrial Park, Son My Commune, Lam Dong Province
SCOPE OF SERVICES
Update Basic Design
PROJECT COMPLETION DATE
Nov/2022 – May/2023
PROJECT DESCRIPTION
Son My LNG Terminal Project aims to supply gasified LNG to Son My I Power Plants and Son My II Power Plants with a capacity of 2,250MW each, with a maximum consumption demand of up to 3.6 million tons of LNG/year (equivalent to about 5 billion m3 of gas/year). Project main items include: Jetty & associated facilities; LNG loading/ unloading facilities; LNG storage tanks & their associated facilities; BOG system; vaporization facilities; Metering facilities; Sea water intake & discharge facilities; Firefighting system and Other facilities such as: electrical system, control system, instrument/utility air system, nitrogen system, control room, generator house, water supply & drainage, waste water treatment, fence, gates. etc...