THE BIOLOGICAL POND SYSTEM PROJECT

OWNER (CLIENT)

Nghi Son Refinery And Petrochemical Limited Liability

LOCATION

Nghi Son Economic Zone, Thanh Hoa Province

SCOPE OF SERVICES

EPC

PROJECT COMPLETION DATE

Jul/2021 - Nov/2022

PROJECT DESCRIPTION

Biological pond system will be constructed for the purpose of providing additional treatment/ emergency containment of wastewater which has been treated from Effluent Treatment Plant (ETP) of the Refinery before being discharged into the sea and so preventing environmental incidents caused by waste water. Main Process System: With Pond system include 05 Ponds: Incident Pont (ET-1) depth of 4m with volume of 5,015m3; Biological Pond No. 1 (SP-1) has a volume of 23,081 m3 and Biological Pond No. 2(SP-2) has a volume of 30,955 m3 and Biological Pond No. 3 (SP-3) has a volume of 39,375m3 and have an equivalent depth of 2.5m, Constructed Wetland Pond (CW-1) and Fish Indication Pond. In addition, has Electrical & Instrument house, Pump Station… Utilities, facilities system include: circulation water system, water filter package, air blowing system, CCTV system, Lighting, Earthing, FFT System, Fire Alarm System Communication System, Instrument Control system, Power management System. Other infrastructure such as Fence, Road, Drainage system, Safety handrail, Cable trench and duct bank

Project images

Related projects

Oil & Gas

Thi Vai LNG Receiving Terminal Expansion Project

AUG/2025 - DEC/2025

Asset 4bb11
Oil & Gas

SON MY LNG TERMINAL PROJECT

Nov/2022 – May/2023

Asset 4bb11
Oil & Gas

YEN HUNG LPG STORAGE TERMINAL PROJECT

Aug/2023 - Sep/2026

Asset 4bb11
Oil & Gas

DENKO THILAWA OIL STORAGE TANK TERMINAL PROJECT

Jun/2018- Nov/2019

Asset 4bb11
Oil & Gas

LONG SON – NEW AIR SEPARATION PLANT PROJECT

Nov/2019 - Apr/2021

Asset 4bb11

Send US A MESSAGE

Contact us now for the fastest consultation & answers to questions