Thi Vai LNG Receiving Terminal Expansion Project

OWNER (CLIENT)

PetroVietnam Gas Joint Stock Corporation (PV Gas)

LOCATION

Cai Mep Industrial Zone, Tan Thanh District, Ba Ria, Vung Tau Province

SCOPE OF SERVICES

FEED Design including +/-10% cost estimation; EPC tender preparation

PROJECT COMPLETION DATE

AUG/2025 - DEC/2025

PROJECT DESCRIPTION

To increase the total natural gas send-out capacity of TERMINAL up to 3 MMTPA (including capacity of Thi Vai LNG 1MMTPA). One (01) LNG storage tank and its associated facilities including: LP LNG pumps; HP LNG pumps; Ship loading pumps; Vaporization facilities; BOG treatment facilities; Metering facilities; Flaring and venting facilities; River water intake and discharge facilities; Interconnecting piping;

Project images

Related projects

Oil & Gas

THE BIOLOGICAL POND SYSTEM PROJECT

Jul/2021 - Nov/2022

Asset 4bb11
Oil & Gas

SON MY LNG TERMINAL PROJECT

Nov/2022 – May/2023

Asset 4bb11
Oil & Gas

YEN HUNG LPG STORAGE TERMINAL PROJECT

Aug/2023 - Sep/2026

Asset 4bb11
Oil & Gas

DENKO THILAWA OIL STORAGE TANK TERMINAL PROJECT

Jun/2018- Nov/2019

Asset 4bb11
Oil & Gas

LONG SON – NEW AIR SEPARATION PLANT PROJECT

Nov/2019 - Apr/2021

Asset 4bb11

Send US A MESSAGE

Contact us now for the fastest consultation & answers to questions