UFC85/FORMALDEHYDE PLANT PROJECT

OWNER (CLIENT)

PetroVietnam Fertilizer & Chemical Corporation (PVFCCo)

LOCATION

Ba Ria - Vung Tau Province

SCOPE OF SERVICES

EPC

PROJECT COMPLETION DATE

Apr/2014 - Nov/2015

PROJECT DESCRIPTION

Capacity of project: UFC85 15,000 Ton/Year or Formaldehyde 37% 25,000 Ton/Year. Main Process System: Reactor, Heat exchanger, Absorbed tower, 02 Loading arm with capacity 20 tons/hr… Utilities, facilities system include: Tank Farm Area for Methanol Storage (760 m3) and Formaldehyde storage (1,176 m3),, piping system, steam system, water supply, instrument air and plant air with tie-in from existing Phu My Fertilizer, new cooling tower and cooling water distribution system, waste water treatment system which using the biological technology, Fire fighting system, Grounding, lightning protection system, fire alarm system, radio system…. Other infrastructure of plant such as Steel structure for process building, pipe rack, pipe bridge, operation platform, foundation, drainage system, Road, paving, fence, gate and landscape system

Project images

Related projects

Fertilizer, Chemical & Petrochemical

BULK DELIVERY SYSTEM PROJECT

Dec/2019 - Oct/2020

Asset 4bb11
Fertilizer, Chemical & Petrochemical

GREEN FIELD PROJECT

Apr/2018 – Apr/2021

Asset 4bb11
Fertilizer, Chemical & Petrochemical

CHLOR ALKALI PLANT PROJECT

May/2018 – Sep/2019

Asset 4bb11
Fertilizer, Chemical & Petrochemical

SeAH M&S VIETNAM PLANT PROJECT

May/2023 - Apr/2024

Asset 4bb11
Fertilizer, Chemical & Petrochemical

SeAH M&S VIETNAM PLANT PROJECT (EPC)

Oct/2024 - Aug/2025

Asset 4bb11
Fertilizer, Chemical & Petrochemical

AMMONIUM NITRATE PLANT PROJECT

Apr/2014 - Nov/2015

Asset 4bb11
Fertilizer, Chemical & Petrochemical

DI-AMMONIUM PHOSPHATE FERTILIZER PLANT

Jan/2012 – Oct/2014

Asset 4bb11

Send US A MESSAGE

Contact us now for the fastest consultation & answers to questions