YEN HUNG LPG STORAGE TERMINAL PROJECT

OWNER (CLIENT)

Yen Hung Petrochemical Joint Stock Company

LOCATION

Bac Tien Phong Industrial Park, Lien Hoa Ward, Quang Ninh Province

SCOPE OF SERVICES

EPC

PROJECT COMPLETION DATE

Aug/2023 - Sep/2026

PROJECT DESCRIPTION

The LPG Refrigerated Terminal total area of 9,6 ha. C3 & C4 Steel double wall storage tank with capacity: C3 Storage tank is 100,000 m3 & C4 Storage tank is 60,000 m3. Pressurized LPG storage tank with capacity: 02 sphere tanks is 6,248 m3. Main process system: LPG Truck Loading, LPG Ship unloading/ loading system, BOG system, C3 Heater system, Flare system. Utilities, facilities and infrastructure: Compressed air, Nitrogen Air, water supply, waste water treatment system; Electrical system included: 22kV substation, Power distribution, lighting, lightning & grounding, fire alarm system, telecommunication; Instrumentation system included: DCS system, ESD system, Fire & Gas system,…Fire fighting system and the infrastructure included control room, pipe rack, parking area, road & paving, drainage system, fence & gate…

Project images

Related projects

Oil & Gas

Thi Vai LNG Receiving Terminal Expansion Project

AUG/2025 - DEC/2025

Asset 4bb11
Oil & Gas

THE BIOLOGICAL POND SYSTEM PROJECT

Jul/2021 - Nov/2022

Asset 4bb11
Oil & Gas

SON MY LNG TERMINAL PROJECT

Nov/2022 – May/2023

Asset 4bb11
Oil & Gas

DENKO THILAWA OIL STORAGE TANK TERMINAL PROJECT

Jun/2018- Nov/2019

Asset 4bb11
Oil & Gas

LONG SON – NEW AIR SEPARATION PLANT PROJECT

Nov/2019 - Apr/2021

Asset 4bb11

Send US A MESSAGE

Contact us now for the fastest consultation & answers to questions