BAC NINH HIGH TECHNOLOGICAL MUNICIPAL WASTE TO ENERGY PLANT

OWNER (CLIENT)

Thang Long Energy Environment Joint Stock Company

LOCATION

Que Vo Ward, Bac Ninh Province

SCOPE OF SERVICES

EPCC

PROJECT COMPLETION DATE

Nov/2021 - Dec/2024

PROJECT DESCRIPTION

The capacity 600 tons of waste/day, with a power generation capacity of up to 11.6MWh . Major equipment: Pre -Treatment Unit: BMH Technology Oy – Finland; CFB Boiler: Valmet Technologies  Oy – Finland; Steam Turbine Generator: SIEMENS ENERGY – India. Main process system: Steam Turbine Generator & Air Compressor Building, Boiler & Flue Gas Treatment System, Cooling tower system, Utilities, facilities and infrastructure: FFT System, Raw Water & Demin water Treatment, Waste Water Treatment System, Air Compressed; Electrical System included: Power distribution house, lighting, lightning & grounding, fire alarm system, telecommunication; Instrumentation system included: DCS system, ESD system, Fire & Gas system. The infrastructure included FFT Pump Station, 22kV Substation, RDF Plant, control room, pipe rack, road & paving, drainage system, weighbridge…..

Project images

Related projects

Bio & Renewable Energy

TRA VINH GREEN HYDRO PLANT PROJECT

Mar/2022 - Jun/2022

Asset 4bb11
Bio & Renewable Energy

40MWP MUI NE SOLAR POWER PROJECT

Aug/2018 - May/2019

Asset 4bb11
Bio & Renewable Energy

BLACK PELLET COMMERCIAL PLANT PROJECT

Oct/2021 – Oct/2022

Asset 4bb11

Send US A MESSAGE

Contact us now for the fastest consultation & answers to questions