Bio & Renewable Energy


OWNER (CLIENT)
Thang Long Energy Environment Joint Stock Company
LOCATION
Que Vo Ward, Bac Ninh Province
SCOPE OF SERVICES
EPCC
PROJECT COMPLETION DATE
Nov/2021 - Dec/2024
PROJECT DESCRIPTION
The capacity 600 tons of waste/day, with a power generation capacity of up to 11.6MWh . Major equipment: Pre -Treatment Unit: BMH Technology Oy – Finland; CFB Boiler: Valmet Technologies Oy – Finland; Steam Turbine Generator: SIEMENS ENERGY – India. Main process system: Steam Turbine Generator & Air Compressor Building, Boiler & Flue Gas Treatment System, Cooling tower system, Utilities, facilities and infrastructure: FFT System, Raw Water & Demin water Treatment, Waste Water Treatment System, Air Compressed; Electrical System included: Power distribution house, lighting, lightning & grounding, fire alarm system, telecommunication; Instrumentation system included: DCS system, ESD system, Fire & Gas system. The infrastructure included FFT Pump Station, 22kV Substation, RDF Plant, control room, pipe rack, road & paving, drainage system, weighbridge…..