Project Name: PV GAS THI VAI TERMINAL – LPG STORAGE RE –ARRANGEMENT PROJECT

Client: PetroVietnam Gas JSC (PV Gas)

Locaction: Cai Mep IZ, Ba Ria – Vung Tau Province, Vietnam

Project period: Aug’2020 – Dec’2020 (4 months)

Description: 3 spherical tank with the capacity 2,000m3/ tank

Capacity: 6,000 m3

Scope: Soil investigation, basic design and cost estimation