-
Long Son – New Air Separation Plant Project
- Nitrogen: 12,500 Nm3/h (equivalent 135,000 tons annual)
- Oxygen: 8,500 Nm3/h (equivalent 105,000 tons annual)
- Argon: 280 Nm3/h Nm3/h (equivalent 4,300 tons annual).
-
BAC NINH HIGH-TECHNOLOGICAL MUNICIPAL WASTE TO ENERGY PLANT
-
BLACK PELLET PILOT PLANT PROJECT
-
Project Name: THE PDH – PP PLANT PROJECT
-
CALCIUM CARBONATE PLANT PROJECT
-
BIOLOGICAL POND SYSTEM PROJECT
-
UPGRADE AND SUPPLY RAW CO2 AT CAMAU FERTILIZER PLANT
- A CO2 absorption tower, a CO2 compressor package (new).
- A CO2 separator, two flash separators and circulating pumps, heat exchangers (utilizing the existing system).
-
PV GAS THI VAI TERMINAL – LPG STORAGE RE –ARRANGEMENT PROJECT
-
SHWE LIN PAN (SLP) DEPOT PROJECT
-
Solar Rooftop Coats Phong Phu Project
-
A new picture of solar energy-Solar Mui Ne
-
Solar Phan Thiet 2019
-
Manufacturing Surgical Sutures Nano Coated Project
-
Infrastructe Expansion
-
New Homecare Liquid (Phase 1, 2, 3) Plant
-
Rock Salt Exploitation & Processing Plant
-
NPK Fertilizer project
-
Di-Ammonium Phosphate Fertilizer Plant
-
Dust Exhaust System of NPK Fertilizer Plant
-
NPK Raw Material Section extension project
-
NPK Compound Fertilizer Plant
-
40MWp Mui Ne Solar Power Project
-
CPP Project
-
Tetra Pak Binh Duong Project
-
Chilly Sauce project
-
Chicken Meat Processing Plant Project
-
Nam Ngu Factory Project
-
Masan Brewery HG Beer Factory
-
New Unilever Food Factory
-
Chlor Alkali plant project
Long Son – New Air Separation Plant Project
OWNER (CLIENT) :
Vietnam Japan Gas Joint Stock Company
LOCATION :
Long Son, Vung Tau City – Ba Ria Vung Tau Province
PERIOD :
Nov-2019 to Apr-2021
PROJECT DESCRIPTION :
Long Son Air Separation Plant is developed to manufacture and distribute high quality gas such as Nitrogen, Oxygen and Argon for industrial purposes, especially for Long Son Petrochemicals Complex, Viet Nam.
SCOPE OF SERVICES :
EPC
CAPACITY :
OTHER :
Total Area: 19,368 m2

BAC NINH HIGH-TECHNOLOGICAL MUNICIPAL WASTE TO ENERGY PLANT
Project Name: BAC NINH HIGH-TECHNOLOGICAL MUNICIPAL WASTE TO ENERGY PLANT
Client: Thang Long Energy Environment JSC.
Locaction: Phu Lang Ward , Que Vo Dist , Bac Ninh Province
Project period: 24 months ( 2021 – 2023)
Description: Capacity of 11.6 MWp, total area of 10 hectares, Using waste treatment technology of BMH Company – Finland. Burn waste to convert it into energy.
Scope: EPC

BLACK PELLET PILOT PLANT PROJECT
Project Name: BLACK PELLET PILOT PLANT PROJECT
Client: Ha Tien Energy Corporation (“HATIECO”)
Locaction:Lot A2, Hoai Tan IC, Hoai Nhon Dist, Binh Dinh Province, Vietnam
Project period: Jun’2020 – Sep’2020 (3 months)
Description: Addition of a torrefaction unit to transform white pellet of existing production plant into black pellet, the best biomass fuel for co-firing. And send back hot flue gas in the process to the existing wood chip dryer for heat recovery.
Capacity: 15,000 ton/year Black Pellet Product
Scope: EPC
Features: Biomass thermal upgrading technology by Direct Torrefaction Rotary Reactor.
Utilize the gasified biomass from torrefaction as fuel for furnace to provide heat back to the reactor.
Process Licensor: TSI (USA)

Project Name: THE PDH – PP PLANT PROJECT
Project Name: THE PDH – PP PLANT PROJECT
Client: Stavian Quang Yen Petrochemical JSC
Locaction: Tien Phong Industry Zone, Quang Ninh Province.
Project period: Oct ‘2021 – Jun ’2022 (09 months)
Description: N/A
Capacity: 600,000 MTPY
Scope: Detail -FS

CALCIUM CARBONATE PLANT PROJECT
Project Name: CALCIUM CARBONATE PLANT PROJECT
Client: Surint Omya Vietnam.
Locaction: Bai Da IZ – Phu Tho
Project period: Oct ‘2021 – Mar ’2022 (06 months)
Description:N/A
Capacity: 50.000 ton/year
Scope: Engineering

BIOLOGICAL POND SYSTEM PROJECT
Project Name: BIOLOGICAL POND SYSTEM PROJECT
Client: Nghi Son Refinery And Petrochemical Limited Liability Company
Locaction: Nghi Son Economic Zone, Hai Yen Commune, Nghi Son District, Thanh Hoa Province, Vietnam.
Project period: 14 months
Description: The System will be constructed for the purpose of providing additional treatment/ emergency containment of wastewater which has been treated from Effluent Treatment Plant (ETP) of the Refinery before being discharged into the sea and so preventing environmental incidents caused by Waste water.
Capacity: 51000 m3/3 Dáy of maximum permitted discharge rate
Scope: EPC
Features: N/A

UPGRADE AND SUPPLY RAW CO2 AT CAMAU FERTILIZER PLANT
Project Name: UPGRADE AND SUPPLY RAW CO2 AT CAMAU FERTILIZER PLANT
Client: Petrovietnam Camau Fertilizer Joint Stock Company (PVCFC)
Locaction: An Khanh, U Minh district, Ca Mau province, VietNam
Project period: Mar’2021 – Apr’2022 (370 days)
Description: The CO2 extraction system is based on the absorption and desorption of activated MDEA fluid (BASF technology), the solvent is used for CO2 absorption is MDEA. The main system includes:
Scope Feature: Install some new equipment that can integrate with existing system to take advantage of the available utilities (MDEA solution, disrober with high pressure and low pressure, stripping column…). After install new system combine with existing system, capacity of CO2 recovery will increase 110 tons/day.

PV GAS THI VAI TERMINAL – LPG STORAGE RE –ARRANGEMENT PROJECT
Project Name: PV GAS THI VAI TERMINAL – LPG STORAGE RE –ARRANGEMENT PROJECT
Client: PetroVietnam Gas JSC (PV Gas)
Locaction: Cai Mep IZ, Ba Ria – Vung Tau Province, Vietnam
Project period: Aug’2020 – Dec’2020 (4 months)
Description: 3 spherical tank with the capacity 2,000m3/ tank
Capacity: 6,000 m3
Scope: Soil investigation, basic design and cost estimation

SHWE LIN PAN (SLP) DEPOT PROJECT
Project Name: SHWE LIN PAN (SLP) DEPOT PROJECT
Client: Denko Petrochemical Management Co., Limited
Locaction: Shwe lin pan Industrial Zone, Hilang District, Yagon City, the Republic of the Union of Myanmar
Project period: 12 months
Description: Engineering, Procurement and Construction a Shwe Lin Pan (SLP) Deport with capacity 10,000m3 fuel storage (included future 5,000m3) to import fuel products from barge and export to truck or barge. Storage fuel products are normal diesel (HSD), premium diesel (PD), gasoline 92 (G92), gasoline (G95), gasoline 97 (G97)
Capacity: 10,000m3 storage for Gasoline and Diesel
Scope: EPC Turnkey.

Solar Rooftop Coats Phong Phu Project
OWNER (CLIENT) :
Solar Power Utility Company(SPUC)
LOCATION :
48 Tang Nhon Phu Street, Tang Nhon Phu B Ward, District 9, HCMC, VN
PERIOD :
Apr’19 – Jul’19
PROJECT DESCRIPTION :
4 building roofs with an area approximate 4000m2, including: Raw material warehouse, Office, Dyehouse, QA building
SCOPE OF SERVICES :
EPC (Expect process equipment)

A new picture of solar energy-Solar Mui Ne

Solar Phan Thiet 2019
TTCL Vietnam was honored to be selected as general contractor of procurement and construction design for the Mui Ne Solar Power Plant project.
This project is building a 40 MWp solar power plant in Mui Ne Ward, Phan Thiet City (total investment of 45.18 Million USD).
This plant is expected to put into commercial operation from May 2019 generating 67 Million KWh green power to Viet Nam Electricity Network annually.
There are bigger solar power projects which are under preparation now.
> Read more: TTCL VIETNAM – SOLAR PHAN THIET 2019 – STEP BY STEP COMPLETED

Manufacturing Surgical Sutures Nano Coated Project
OWNER (CLIENT) :
Medical Devices and Biomaterial Plant Joint Stock (MEDEP JSC.)
LOCATION :
Saigon High Tech Park, District 9, HCMC
PERIOD :
Oct’18 -May’19
PROJECT DESCRIPTION :
About 25 clean rooms class 7/8/9following ISO 14644
SCOPE OF SERVICES :
EPC (Expect process equipment)

Infrastructe Expansion
OWNER (CLIENT) :
Kimberly-Clark Vietnam Limited
LOCATION :
VSIP-1, Binh Duong , Vietnam
PERIOD :
Dec’12 – Sep’13
PROJECT DESCRIPTION :
Infrastructure Expansion
SCOPE OF SERVICES :
EPCM

New Homecare Liquid (Phase 1, 2, 3) Plant
OWNER (CLIENT) :
Unilever Vietnam
LOCATION :
Tay Bac–Cu Chi IZ, HCMC, Vietnam
PERIOD :
2010
PROJECT DESCRIPTION :
New Homecare Liquid (Phase 1, 2, 3) and VIM Plant
SCOPE OF SERVICES :
E & Services

Rock Salt Exploitation & Processing Plant
OWNER (CLIENT) :
VINACHEM / VILACHEMSALT
LOCATION :
Khammouane, Laos
PERIOD :
Aug’15- Nov’18
PROJECT DESCRIPTION :
Potash (KCL95%) 320,000 TPY
NaCl (NaCL98%) ≤ 300,000 TPY
SCOPE OF SERVICES :
EPC Turn -Key Lump Sum
(Consortium with TTCL Public)

NPK Fertilizer project
OWNER (CLIENT) :
Baconco Co. Ltd.
LOCATION :
Phu My IZ, Baria – Vung Tau, Vietnam
PERIOD :
Nov’13 – Jul’14
PROJECT DESCRIPTION :
100,000 TPY NPK Fertilizer new production line
SCOPE OF SERVICES :
EPC Turn -Key Lump Sum

Di-Ammonium Phosphate Fertilizer Plant
OWNER (CLIENT) :
DAP-2 VINACHEM JSC.
LOCATION :
32ha ,TangLoong IZ, Lao Cai, Vietnam
PERIOD :
Jan’12 – Oct’14
PROJECT DESCRIPTION :
330,000 TPY Diammonium Phosphate Fertilizer Plant
SCOPE OF SERVICES :
EPC Turn -Key Lump Sum
(consortium with TTCL Public)

Dust Exhaust System of NPK Fertilizer Plant
OWNER (CLIENT) :
Baconco Co. Ltd.
LOCATION :
Phu My IZ, Baria – Vung Tau, Vietnam
PERIOD :
Nov’08 – Mar’09
PROJECT DESCRIPTION :
Dust Exhaust System of NPK Fertilizer Plant
SCOPE OF SERVICES :
EPC Turn – Key Lump Sum

NPK Raw Material Section extension project
OWNER (CLIENT) :
Japan Vietnam Fertilizer Company
LOCATION :
Go Dau IZ, Dong Nai, Vietnam
PERIOD :
2007
PROJECT DESCRIPTION :
NPK Raw Material Section extension including facility
SCOPE OF SERVICES :
EPC

NPK Compound Fertilizer Plant
OWNER (CLIENT) :
Japan Vietnam Fertilizer Company
LOCATION :
Go Dau IZ, Dong Nai, Vietnam
PERIOD :
1997
PROJECT DESCRIPTION :
350,000TPY NPK Compound Fertilizer Plant
SCOPE OF SERVICES :
EPC (Under TTCL Public Co.Ltd)

40MWp Mui Ne Solar Power Project
OWNER (CLIENT) :
Duc Thanh – Mui Ne Joint Stock Company
LOCATION :
Phan Thiet, Binh Thuan province, Vietnam
PERIOD :
Aug’18-May’19
PROJECT DESCRIPTION :
40 MWp Mui Ne Solar Power
SCOPE OF SERVICES :
EPC
> Read more: 40MWp MUINE SOLAR POWER PLANT PROJECT” – GROUND BREAKING CEREMONY
> Read more: TTCL VIETNAM – SOLAR PHAN THIET 2019 – STEP BY STEP COMPLETED

CPP Project
OWNER (CLIENT) :
CP Paper Corporation
LOCATION :
Le Minh Xuan IZ, HCMC
PERIOD :
May’18 – Apr’19
PROJECT DESCRIPTION :
Over 20,000m2 warehouse to store papers
SCOPE OF SERVICES :
EPCM

Tetra Pak Binh Duong Project
OWNER (CLIENT) :
Tetra Pak Vietnam JSC
LOCATION :
VSIP 2A, Binh Duong, Vietnam
PERIOD :
Jan’17 – Dec’17
PROJECT DESCRIPTION :
5 Chillers of total capacity 2750 Ton 24 AHUs , FM Gobal , LEED Gold Version 4
SCOPE OF SERVICES :
EPCM

Chilly Sauce project
OWNER (CLIENT) :
Masan Food Corporation
LOCATION :
Tan Dong Hiep A IZ, Binh Duong, Vietnam
PERIOD :
Mar’17 – Dec’17
PROJECT DESCRIPTION :
Chilly Sauce project
SCOPE OF SERVICES :
E&CM

Chicken Meat Processing Plant Project
OWNER (CLIENT) :
Koyu & Unitek Co., Ltd.
LOCATION :
Lot C8 , Long Binh IP , Long Binh Ward , Bien Hoa , Dong Nai
PERIOD :
Jul’16 – Feb’17
PROJECT DESCRIPTION :
Chicken meat with the capacity of 10,000 ton product / year , about 20 hygiene clean room following HACCP
SCOPE OF SERVICES :
EPC (except process equipment)

Nam Ngu Factory Project
OWNER (CLIENT) :
Masan Phu Quoc
LOCATION :
Phu Quoc – Kien Giang
PERIOD :
Nam Ngu Factory Project
PROJECT DESCRIPTION :
2016
SCOPE OF SERVICES :
E

Masan Brewery HG Beer Factory
OWNER (CLIENT) :
Masan Brewery HG Company Ltd.
LOCATION :
Can Tho, Vietnam
PERIOD :
May’15- Feb’16
PROJECT DESCRIPTION :
Masan Brewery HG Beer Factory
SCOPE OF SERVICES :
PMC Services

New Unilever Food Factory
OWNER (CLIENT) :
Unilever Vietnam
LOCATION :
Tay Bac–Cu Chi IZ, HCMC, Vietnam
PERIOD :
Oct’10 -Oct’11
PROJECT DESCRIPTION :
New Unilever Food Factory
SCOPE OF SERVICES :
PMC service

Chlor Alkali plant project
OWNER (CLIENT) :
Dai Ngan Son Service Trading Manufacturing Co. Ltd.
LOCATION :
Tien Giang Province, Vietnam
PERIOD :
May’18 – Sep’19
PROJECT DESCRIPTION :
Chlor Alkali plant with capacity of 54,000 TPY NaOH (as NaOH 100%), 32,000 TPY HCL (As 100% Cl2), 7,166 TPY NaClO
SCOPE OF SERVICES :
EPCM
