Tetra Pak Group is the world’s leading supplier of liquid packaging products and solutions with very high automation technology, strict requirements for safety and quality when implementing projects. With a total investment of 120 milion EURO on an area of over 34.950 m2, on the campus 100,000m2. The Owner expects Tetra Pak Binh Duong factory to be the standard of factories that Tetra Pak Group has built around the world.


Overcoming competitors , TTCL Viet Nam company ( referred to as TVC) with more than 22 years of experience in Vietnam and Southeast Asia markets in the field of project management and construction has met the requirments and targets, criteria that Tetra Pak offers. Since then, Tetra Pak investor has trusted and selected TVC as the project management contractor for the new factory (Greenfiled Factory).
For desgin work, Tetra Pak has used the basic desgin team (Sweden) as a collection of units that have been involved in designing Tetra Pak in 44 project worldwide including 6 Tetra Pak factories in Sweden. However, the contractor managing the host country must be responsible for checking the basic desgin, considering it in accordance with current standards, legal regulations and implementing construction desgin to meet the law of host country. In addition, Tetra Pak also applies FM standard and fire prevention desgin for the project. Much of the work, information is exchanged e –mail, video calls, plus a large time zone diffrence between Northern Europe and Sountheast Asia. With a huge amount of work, about 400 construction drawings and 3200 ME drawings, combined with very high standard of material and equipment are from European countries.
Combining the above factors, Tetra Pak project is considered a verry big challenge for the project management team in particual and TVC in general.
Moreover, during the project implementation, Tetra Pak management decided to apply LEED GOLD version 4 for the whole project is also a high technical requirement for desgin, purchase and management public. This project is the first project in Vietnam, the 14th in the world and the first in the world to achieve LEED GOLD version 4 standard.
To meet the project requirements, TVC has established a management board with sufficient capacity, experience and enthusiasm to implement the most stringent requirements from the investor. With desgin tools (Revit, PDMS, Cadwork…) and a team of engineers trained, trained, experience in evaluation,negotiation and selection of contractors drawn from EPC project, teams the purchasing team of TVC has helped the owner to select suitable contractors, suppliers in terms of quality, cost and assurance of project progress, to meet the Own is expectations.
Another great challenge is the construction progress that the investor sets out in this project. In just 6 months with most supplies and equipment must be imported from abroad (Europe). This is the shortest construction time worldwide of 44 Tetra Pak factories.
Especially, the structure of Laminator machine foundation has construction time wihin 60 days along with the highest construction standards in the world today that Vietnamese contractors as well ass TVC must understand all technical requirments,meticulousness from contruction methods, ways of coordination, risk management, quality perfection. Once again TVC has to face and overcome a tough challenge.
With management experience and understanding of the project, the management team of TVC must ensure all elements of safety, progress, quality and cost to make the project completed as expected.
TVC ‘s project management team collaborated with the investor and contractors closely to keep up with every detail of work, strictly comply with safety,construction methods, to complete items from small to big project.
Throughout the project implementation period, with long term experience in the field of EPC, TVC has evaluated, advised and forecasted for the Owner, Main contractor (construction, MEP) about worker productivity, weekly, monthly to ask the contractor to strengthen and allocate appropriate resources in each stage of the project. Since then, there has been an active step in managing construction progress. This is a record milestone of TVC for a light industrial project so far. Especially Tetra Pak is extremely high safety requirements.
Safety management, with training efforts, disseminating deep safety regulations for each worker and managerial staff. Along with the close supervision of TVC, the project has reached over 2,305,968 safe working hours on site, no accidents. This is a record milestone of TVC for a light inddustrial.
For the quality management system of its EPC projects, it is applied to the Tetra Pak binh duong project. With the same system and people, TVC has been evaluated by the investor to successfully complete the project as Mr Adolfo Orive – tetra Pak group president and CEO: “This is the most outstanding project. Tetra Pak in Asia and Pacific region.”